hier anmelden...    
  Menü
Community
Anmeldung
Dein Account
Private Nachrichten
Chatroom
Forum
- Azubi Corner
- Einstellungstests
- Bewerbungen
- Prüfungen
Fortbildung:
Bankfachwirt:
Fachwirtstudium
Inhalte
Orte
Infomaterial
Kontakt
Fachwirt für Finanzberatung:
Allgemeines
Ablauf
Inhalte
Infomaterial
Kontakt
Specials



Online-Games
Downloads
Ausbildungsplatz

Artikelsuche

Infos
Feedback
Impressum
Unsere Banner
Linksammlung

Additional Drill Holes at Longshot Ridge Encounter Grades of 3.10%, 2.13% and 1.08% Copper

Geschrieben am 16.11.2006 - [Nächster Artikel]

Las Vegas, Nevada, November 16 (ots/PRNewswire) - Canyon Copper
Corp. (the 'Company' or 'Canyon Copper') (OTCBB: CYOO) is pleased to
announce results from a further six drill holes completed on the
Company's New York Canyon copper project located in the Santa Fe
Mining District, Mineral County, Nevada.

Results were recently received from re-analyses conducted on all
pulps generated from the 2006 drill program. Analyses were completed
by ALS Chemex using their AA62 atomic absorption procedure. Sample
pulps were not analysed in numeric order and therefore drill results
are not provided in the order in which the holes were drilled. The
six holes with analytical results currently available include 06-10R,
12R, 16R, 17C, 18R and 19R. Results for the remaining 18 holes from
the 2006 drill program will be reported once received and reviewed
for accuracy. Reverse Circulation holes are designated "R" and
diamond drill core holes are designated "C". A summary of the results
are as follows:


-------------------------------------------------------------------------
HOLE ID FROM TO LENGTH % Cu
(in feet) (in feet)(in feet)
------------------------------------------------------------------------
06-10R 0 30 30 0.31
------------------------------------------------------------------------
-----------------------------------------------------------------------
06-12R 0 5 5 0.35
------------------------------------------------------------------------
95 220 125 0.38
------------------------------------------------------------------------
Including 195 220 25 0.57
------------------------------------------------------------------------
------------------------------------------------------------------------
06-16R 100 145 45 0.46
------------------------------------------------------------------------
-----------------------------------------------------------------------
06-17C 85 115 30 2.13
------------------------------------------------------------------------
------------------------------------------------------------------------
06-18R 40 90 50 0.8
------------------------------------------------------------------------
------------------------------------------------------------------------
06-19R 0 95 95 1.08
------------------------------------------------------------------------
Including 30 50 20 3.1
------------------------------------------------------------------------


RC drill 06-10R was drilled to a depth of 200 feet. Sample results
returned 0.31 % copper over a 30 foot interval from surface. The hole
was drilled in the central eastern portion of Longshot Ridge.

Hole 06-12R was drilled to a depth of 265 feet and intersected a
125 foot interval from 95 to 220 feet averaging 0.38% copper,
including a 25 foot interval from 195 to 220 feet averaging 0.57%
copper. This hole was drilled approximately 250 feet south of 06-10R.

Hole 06-16R, located in the south central area approximately 250
feet northeast of 06-18R, returned an average of 0.46 % copper over a
45 foot interval from 100 to 145 feet.

Diamond drill hole 06-17C was drilled near the southern limits of
the mineralized Longshot Ridge zone. This hole returned an average of
2.13% copper over a 30 foot interval from 85 to 115 feet from a skarn
altered horizon within marble. Results from this hole indicate that
the mineralization remains open to the south.

Hole 06-18R, located 450 feet northwest of 06-17C in the southern
area of Longshot Ridge, returned an average of 0.80% copper over a 50
foot interval from 40 to 90 feet. The skarn mineralization
encountered in this hole remains untested to the south.

Hole 06-19R returned an average of 1.08% copper over a ninety five
foot interval starting from surface hosted. Mineralization is hosted
within skarn altered siltstone. Included in this interval is a 20
foot interval from 30 feet to 50 feet that averaged 3.10% copper.
This drill hole is located in the southern area of the Longshot Ridge
copper-oxide zone.

About Canyon Copper

-------------------

Canyon Copper Corp.'s New York Canyon Property is located in the
New York Canyon area of the Santa Fe Mining District, Mineral County,
Nevada. The project hosts oxide and sulphide copper bearing
mineralization outlined by historical operators. The most advanced of
these zones is the Longshot Ridge copper oxide deposit. This zone has
not been completely outlined and remains open in all directions. The
Copper Queen mineralized zone is located approximately three
kilometers west of Longshot Ridge and hosts copper and molybdenum
sulphide mineralization. Several additional mineralized areas
identified throughout the New York Canyon property have yet to be
explored.

Canyon Copper has successfully fulfilled its exploration
commitments on the New York Canyon project. Geoffrey Goodall, P.Geo.
is the Exploration Manager for Canyon Copper and is responsible for
the design and supervision of the exploration programs.

On behalf of the Board of Directors,

Canyon Copper Corp.

Bryan Wilson, President

Disclaimer: This Press Release may contain, in addition to
historical information, forward-looking statements within the meaning
of Section 27A of the Securities Act of 1933, as amended, and Section
21E of the Securities Exchange Act of 1934, as amended. These
forward-looking statements are identified by their use of terms and
phrases such as " believe," "expect," "plan," "anticipate" and
similar expressions identifying forward-looking statements. Investors
should not rely on forward-looking statements because they are
subject to a variety of risks, uncertainties and other factors that
could cause actual results to differ materially from the Company's
expectations, and expressly does not undertake any duty to update
forward-looking statements. These factors include, but are not
limited to the following, the Company's ability to obtain additional
financing, geological or mechanical difficulties affecting the
Company's planned geological work programs, uncertainty of estimates
of mineralized material and other factors which may cause the actual
results, performance or achievements of the Company to be materially
different from any future results, performance or achievements
expressed or implied by such forward- looking statements.

ots Originaltext: Canyon Copper Corp.
Im Internet recherchierbar: http://www.presseportal.de

Contact:
For further information: Investor Relations, 1-888-331-9326
 
  Login
Benutzername

Passwort

Kostenlos registrieren!

  Themen-Infos
· Mehr zu dem Thema Aktuelle Wirtschaftsnews

Der meistgelesene Artikel zu dem Thema Aktuelle Wirtschaftsnews:
DBV löst Berechtigungsscheine von knapp 344 Mio. EUR ein


  Artikel Bewertung
durchschnittliche Punktzahl: 0
Stimmen: 0

Bitte nehmen Sie sich einen Augenblick Zeit, diesen Artikel zu bewerten:

Exzellent
Sehr gut
gut
normal
schlecht




Nachrichten-Archiv

Wirtschaft   Juli 2007 Wi, August 2007 Wi, September 2007 Wi, Oktober 2007 Wi, November 2007 Wi, Dezember 2007 Wi, Januar 2008 Wi, Februar 2008 Wi, März 2008 Wi, April 2008 Wi, Mai 2008 Wi, Juni 2008 Wi, Juli 2008 Wi, August 2008 Wi, September 2008 Wi, Oktober 2008 Wi
Finanzen Juni 2007 Fi, Juli 2007 Fi, August 2007 Fi, September 2007 Fi, Oktober 2007 Fi, November 2007 Fi, Dezember 2007 Fi, Januar 2008 Fi, Februar 2008 Fi, März 2008 Fi, April 2008 Fi, Mai 2008 Fi, Juni 2008 Fi, Juli 2008 Fi, August 2008 Fi, September 2008 Fi Oktober 2008 Fi
Sonstiges April 2006 So, Mai 2006 So, Juni 2006 So, Juli 2006 So, August 2006 So, September 2006 So, Oktober 2006 So, November 2006 So, Dezember 2006 So, Januar 2007 So, Februar 2007 So, März 2007 So, April 2007 So, Mai 2007 So, Juni 2007 So,
Fortsetzung August 2007 So, September 2007 So, Oktober 2007 So, November 2007 So, Dezember 2007 So, Januar 2008 So, Februar 2008 So, März 2008 So, April 2008 So, Mai 2008 So, Juni 2008 So, Juli 2008 So, August 2008 So, September 2008 So, Oktober 2008 So
Sport Februar 2008 Sp, März 2008 Sp, April 2008 Sp, Mai 2008 Sp, Juni 2008 Sp, Juli 2008 Sp, August 2008 Sp, September 2008 Sp, Oktober 2008 Sp


Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved. PHP-Nuke is Free Software released under the GNU/GPL license. - Erstellung der Seite: 0.676 Sekunden